Sweden · September 2025 – July 2026
Municipality of Lund, Sweden
Multi-parameter river monitoring system
Monitoring stations that continuously measure seven parameters in river water were installed for the Municipality of Lund; the data was brought together on a single panel and made available remotely.
Norway · July 2026
Oslo (Alna River) and Municipality of Tromsø, Norway
River and urban water quality monitoring systems
Water quality monitoring systems with circulating measurement cells were installed on the Alna River in Oslo and in Tromsø, designed for sudden pollution events and Arctic conditions.
Çerkezköy, Tekirdağ · 2024 – 2025 · TÜBİTAK 1711 / in cooperation with TÜBİTAK MAM
Erak Giyim San. ve Tic. A.Ş.
AI-assisted recovery of RO concentrate
An AI-assisted control algorithm that makes decisions based on the real-time chemical profile of the dye bath was developed, and reverse osmosis concentrate that was previously discharged was returned to production.
Bursa · 2024 · Phase 1
Area:Elyaf Tekstil San. ve Tic. A.Ş.
Wastewater recovery plant
A four-stage, 120 m³/day recovery plant that turns biological treatment effluent from dyeing and finishing into process water was delivered turnkey.
Adana · TÜBİTAK 1707 Contract R&D · 2025 – 2027 · ongoing
Atlas Denim Tekstil San. ve Tic. A.Ş.
Near-zero liquid discharge with a photocatalytic ozone reactor
A photocatalytic ozone reactor, with ozone dose and UV power adjusted by smart control, is being developed to break down persistent organics in reverse osmosis concentrate.
TÜBİTAK 1707 Contract R&D · 2025 – 2027 · ongoing
Beyçelik Gestamp Otomotiv Sanayi A.Ş.
Autoencoder and IoT-based water use anomaly detection
A system is being developed that detects leaks and faults without labelled fault data, using an autoencoder-based deep learning model that learns the plant’s water use.
August 2024 · 2 stations
Area:Koza Altın İşletmeleri A.Ş.
Co-Plus installation at a mining wastewater treatment plant
For mining wastewater whose quality varies widely with the ore structure, the Co-Plus system that manages chemical dosing based on measurements was commissioned at two stations.
Çorlu, Tekirdağ · 2018 – 2022 · 2 stations
Area:Çorlu Leather OIZ Directorate
Co-Plus chemical treatment optimisation system
At a 12,000 m³/day central leather wastewater treatment plant, real-time measurement was combined with machine learning-based process control.
Kırıkkale · 2018 – 2021
Area:Samsung Kırıkkale IPP
Co-Plus treatment control system at a natural gas combined cycle power plant
At the treatment plant of a natural gas combined cycle power plant, operator-dependent fixed dosing was replaced with measurement-based automatic dosing, and stable floc formation was achieved for the first time.
Sakarya · 2019 – 2021
Toyota Motor Manufacturing Turkey, Sakarya Plant
Co-Plus system and multi-parameter measurement
A system measuring pH, TSS, COD and conductivity simultaneously was installed for paint shop and surface treatment wastewater; the measurements feed Co-Plus to automate chemical dosing.
Çanakkale · September 2026 – January 2027
Area:Biga Organised Industrial Zone
Multi-parameter measurement, flowmeter and colour measurement system
Flow monitoring and billing stations were installed at 20 points in Biga OIZ; by measuring water quality and flow together, pollution load was made calculable for each factory.
April 2026
Asım Kibar Organised Industrial Zone
Multi-parameter online measurement system
An online measurement system running in an outdoor IP67 cabinet was installed to detect discharge events and take instant samples at a factory without continuous discharge.